About the copper substrate processing and construction of Ji
Addtime:2020年-04月-08日Source:未知 【Fonts:Large Medium Small
On May 7, 2018, Jiangmen Longxing Electronic Materials Co., Ltd. in accordance with the regulations on the administration of environmental protection of construction projects newly revised by the State Council, the Interim Measures for the acceptance of environmental protection of construction projects completed by the Ministry of environmental protection (Guo Huan GUI Huan Ping [2017] No. 4), Guangdong Environmental Protection Department Yue Huan Han [2017] 1945 No. document and other relevant regulations, independently held the acceptance meeting of water and gas environmental protection for the completion of copper substrate processing construction project of Jiangmen Longxing Electronic Materials Co., Ltd. (hereinafter referred to as "the project"), and accepted the project in accordance with relevant national laws and regulations, technical specifications for the acceptance of environmental protection for the completion of the construction project, the environmental impact report of the project and the reply of the environmental protection department.
 
 
 
The construction unit Jiangmen Longxing Electronic Materials Co., Ltd. has set up an acceptance working group, which is composed of 5 staff members of Jiangmen Longxing Electronic Materials Co., Ltd. (the list is attached). The participants listened to the implementation of project construction and environmental protection, the introduction of acceptance monitoring and the implementation of environmental protection measures, reviewed the acceptance monitoring report and relevant materials, and the acceptance working group conducted on-site inspection on the project site and the project environmental protection measures, and reviewed the acceptance report. After full discussion, the acceptance opinions are as follows:
 
 
 
1、 Basic information of project construction
 
 
 
(1) Construction site, scale and main construction contents
 
 
 
Jiangmen Longxing Electronic Material Co., Ltd. is an enterprise that produces copper substrate with epoxy fiber cloth, copper foil and aluminum plate. Jiangmen Longxing Electronic Materials Co., Ltd. copper substrate processing construction project (hereinafter referred to as "the project") is located at No. 241, ChaoLian Avenue, Jiangmen City, with an annual output of 1 million copper substrates.
 
 
 
(2) Construction process and environmental protection approval
 
 
 
The project implemented the environmental impact assessment system and the "three Simultaneities" system.
 
 
 
According to relevant laws and regulations on environmental protection, the construction unit entrusted Jiangmen Environmental Science Research Institute to prepare the environmental impact report of copper substrate processing construction project of Jiangmen Longxing Electronic Materials Co., Ltd. (April 2016), and obtained the environmental assessment approval of Jiangmen Environmental Protection Bureau in May 2016 (JHS [2016] No. 89).
 
 
 
The main works and supporting environmental protection facilities of the project were commenced in April 2016 and completed in November 2017. In November 2017, Jiangmen Longxing Electronic Materials Co., Ltd. entrusted Guangdong Xinchuang Huake environmental protection Co., Ltd. to carry out environmental protection acceptance monitoring on the completion of the construction project. After on-site investigation and consulting relevant technical data by technical personnel, the acceptance monitoring plan was prepared. According to the plan, Guangdong Xinchuang Huake environmental protection Co., Ltd. in 2017 On November 17, the on-site monitoring work was carried out, and the environmental management of the enterprise was inspected, and the waste gas detection report of Jiangmen Longxing Electronic Materials Co., Ltd. (lcde17115660) was issued. During the acceptance monitoring, the operation load of the project was over 75%, which met the requirements of the environmental protection acceptance monitoring of the project.
 
 
 
(3) Investment
 
 
 
The actual total investment of the project is about 2.8 million yuan, of which environmental protection investment is about 200000 yuan, accounting for 7.1% of the total investment.
 
 
 
(4) Acceptance scope
 
 
 
The acceptance scope includes:
 
 
 
1. Waste water: domestic sewage;
 
 
 
2. Waste gas: boiler waste gas, hot press waste gas.
 
 
 
2、 Project changes
 
 
 
The engineering content of this project is compared with that of Jiangmen Environmental Protection Bureau's reply to the environmental impact report form of copper substrate processing construction project of Jiangmen Longxing Electronic Materials Co., Ltd. (JHS [2016] No. 89), and there is no change in the construction site, production process and output.
 
 
 
3、 Implementation of EIA reply
 
 
 
The project basically implements the requirements of Jiangmen Environmental Protection Bureau's reply to the environmental impact report form of copper substrate processing construction project of Jiangmen Longxing Electronic Materials Co., Ltd. (JHS [2016] No. 89).